ISO/DIS 37014 · stage 40.60 Close of voting Ballot closed 10 June 2026 Planning date 15 Sep 2027, our estimate Official record
37014ISO 37014 Revision CheckerGroup governance maturity, before publication

All 35 requirements · Governance maturity measurement framework

Model requirement 5.3.4

Oversee

What ISO 37004:2023 asks at 5.3.4, in our own words, and how it reads inside a controlled group. The draft's public contents heading for it is 5.3 Measurement activities.

01The requirement

What the model asks

The governing body should oversee each evaluation so that it serves its purpose, keeps to the scope set for it, meets its objectives and follows the measurement principles. It should ask those it has delegated to for reports that are accurate and on time, see that problems and incidents (for example lack of resources, people not responding, or bias) are dealt with, take corrective action where needed, and satisfy itself that the reports it gets are accurate.

02In a controlled group

What it means when one board controls another

Oversight of the evaluation is itself a governance act. In a group, the controller's audit committee is the natural owner, but the controlled entities need a route to raise a concern about the process. Record that route, and any intervention it produced.

03What to record

Evidence an evaluator asks for

A maturity rating is a claim about how the group governs. The evidence is what proves it operated. Keep both, and keep them together.

  • Oversight: Governing body oversight records of the evaluation, issues addressed and assurance obtained
04Gaps

Where evaluations commonly find gaps

  • Bias and non-response unaddressed
  • Reports accepted without assurance
05How it is rated

How this requirement enters the rating

This unit is one of the five measurement activities. Treat it as a programme step with its own artefact and its own owner, and record the artefact in the evaluation file. The activity page carries what to keep.

It carries 1 evidence item and 2 common gaps in the model. One item is enough only if it is the artefact that proves the practice operated, not a policy that says it should. Both gaps are seen often enough in first evaluations that the evaluation design should test for them explicitly. The group application on this page is ours; the requirement and evidence are the model's, stated in our own words.

06Read next
07Source

Source for this page

Retrieved 2026-10-21. The requirement above is our statement of the clause in our own words; the official text is linked so you can check it.

Note on the draft: The requirement, evidence and gaps on this page are read from ISO 37004:2023, which the draft states it builds on. The draft's own clause body is not public, so this page does not state it. The clause reference at the top is the draft's public contents heading that this requirement sits under.