ISO/DIS 37014 · stage 40.60 Close of voting Ballot closed 10 June 2026 Planning date 15 Sep 2027, our estimate Official record
37014ISO 37014 Revision CheckerGroup governance maturity, before publication

All 35 requirements · Governance maturity measurement framework

Model requirement 5.3.3

Implement

What ISO 37004:2023 asks at 5.3.3, in our own words, and how it reads inside a controlled group. The draft's public contents heading for it is 5.3 Measurement activities.

01The requirement

What the model asks

The people the governing body has properly delegated to should run the implementation, keeping within the limits the governing body has set and within the measurement principles, and should be able to reach every relevant person and all the evidence the design calls for. The work includes: agreeing a timetable and deadlines; drawing up a resource plan; preparing for and managing dependencies; making agreements; coordinating with entities, with stakeholders or with those who represent them; communicating with and involving participants; setting up technology; finding, collecting and converting information; checking inputs; monitoring the work; and reporting on progress.

02In a controlled group

What it means when one board controls another

Fieldwork in a group needs access to both levels. An evaluation that interviews only the controller's executives will rate the entity boards from the outside. Record who was interviewed, in which entity, and whether the entity's own view of its autonomy was heard.

03What to record

Evidence an evaluator asks for

A maturity rating is a claim about how the group governs. The evidence is what proves it operated. Keep both, and keep them together.

  • Evaluation implementation: Evaluation plan, resource plan, evidence gathered and verified, progress reports
04Gaps

Where evaluations commonly find gaps

  • Evaluators denied access to personnel or evidence
  • Inputs not verified
05How it is rated

How this requirement enters the rating

This unit is one of the five measurement activities. Treat it as a programme step with its own artefact and its own owner, and record the artefact in the evaluation file. The activity page carries what to keep.

It carries 1 evidence item and 2 common gaps in the model. One item is enough only if it is the artefact that proves the practice operated, not a policy that says it should. Both gaps are seen often enough in first evaluations that the evaluation design should test for them explicitly. The group application on this page is ours; the requirement and evidence are the model's, stated in our own words.

06Read next
07Source

Source for this page

Retrieved 2026-10-21. The requirement above is our statement of the clause in our own words; the official text is linked so you can check it.

Note on the draft: The requirement, evidence and gaps on this page are read from ISO 37004:2023, which the draft states it builds on. The draft's own clause body is not public, so this page does not state it. The clause reference at the top is the draft's public contents heading that this requirement sits under.

The maturity kit, USD 299 one off. The 35-requirement register, the 54-cell maturity worksheet, the evidence list and a dated plan, as PDF, CSV and XLSX.

See the kit Open the free specimen